Tag Archives : Torquing Hardware

Time is running out…


With my inspection scheduled for Tuesday I am working long hours and on the items that affect airworthiness. Fancy interior and other bells and whistles will have to wait. I finished the last of the heavy lifting for sanding, woohoo! So today’s three hours of sanding included; pilot door sill and surround, the inside cabin top, and left wing tip…

Read More »

Baggage area, check


I finished up the baggage area today. This included riveting the diagonal cover I had to drill out the rivets yesterday due to other rivets I had forgotten to pound… I fabricated a new steel baggage door lever, since the one that was included was 90 degrees off from what I needed. But on the plus side it provided me…

Read More »

Panel done???


Oh I’m sure something will pop up but this morning I finished the wiring behind the panel and was happy to see the autopilot servos were detected, firmware automatically updated, and the looked good. I may have accidentally run the aux fuel tank pumps for a second, so I know those work too. I still need to wire the wing…

Read More »

Tunnel done? I know you have heard this before


So I think the tunnel is done. Well actually I want to give it one last cleaning… So today was again shorter than normal due to a two hours IPC (Instrument Proficiency Check) in a RV-7A. Went well and technically I’m free to fly IFR. In reality I have lot of work to do learning glass panel flying. Today began…

Read More »

New year kick off


Late start today but still made some good progress – started with tightening the jam nuts and torque sealing the Elevator push/pull tubes. Then I fabricated an additional rudder cable guide and got it installed, followed by reorienting the rudder cable/pedal bolts to give more room from the rear seat scat tube and bent over the cotter pin in the…

Read More »