Tag Archives : Throttle Quadrant

Tunnel done? I know you have heard this before


So I think the tunnel is done. Well actually I want to give it one last cleaning… So today was again shorter than normal due to a two hours IPC (Instrument Proficiency Check) in a RV-7A. Went well and technically I’m free to fly IFR. In reality I have lot of work to do learning glass panel flying. Today began…

Read More »

New year kick off


Late start today but still made some good progress – started with tightening the jam nuts and torque sealing the Elevator push/pull tubes. Then I fabricated an additional rudder cable guide and got it installed, followed by reorienting the rudder cable/pedal bolts to give more room from the rear seat scat tube and bent over the cotter pin in the…

Read More »

Trying to button up the tunnel


Back from winter break. Crazy but the build was at a standstill while I was gone. Huh. Guess I better get cracking. Started the day riveting the second rear seat back and then made the hinge pins. I set them aside until after I’m able to test the avionics, just in case there is an issue and I need to…

Read More »

So much for the planned wheel install today


I was so looking forward to getting the wheels on today. Landing gear installed – check. Tires, tubes, rims ready to go – check. Assembly, fuck me. Learned today that Matco wheels don’t use standard tubes. The hole for the valve is offet about an inch. Blerg, new tubes on order. On the positive side, ProSeal the bungs for the…

Read More »