Tag Archives : Lighting

Success!


With four hours until the inspector arrived it was hustle time to knock off the last few items. First up was installing the lighting and Plexiglas in the right wing tip. After making a few passes on englarging the opening the landing and taxi lights slid right in and from there is was easy going. The wing root fairings were…

Read More »

Big final push


My work day started at 4:00am and I put in 16 hours getting my plane ready for tomorrows inspection. And yes, I am exhausted. But I should be ready to go after a few hours checking the final items off the list. Today I finally got around to the louvers on the bottom cowling. This was a time consuming process…

Read More »

Interior Clean Up


The day started off with making good time on the right wing tip access door. Everything fell into place and soon I had everything cleco’d together and flox between the fiberglass door and the metal stiffener curing. Then is was on to electrical stuff. I knocked out the prep wiring for the right wing tip light. So once the tip…

Read More »

Add certification to N241VP


No not the Airworthiness, but rather certification of the transponder and static systems. This was a much more involved process than I expected. All told it took three and a half hours. A good chunk of that was fixing leaks. At every threaded fitting there was a leak. I had used teflon tape but the system still leaked. Could have…

Read More »

Full steam ahead!


Another day of checking off boxes. I got the tail strobe wired up and threw down a thick layer of micro on the VS tip fairing. While that cured, the final skin got riveted. Wow, that felt great – even if it was quite loud bucking the rivets. The fuel servo was next up and thankfully the throttle and mixture…

Read More »

The cabin top has a parasite


Sooo, I finished up the sanding/priming of the right elevator trip fairing before moving on to wiring the overhead console lights. I needed to get the console finished so it could be attached to the cabin top. This meant putting in the eight single lug nutplates that I had to order way back when I last worked on attaching the…

Read More »

Wiring part 2??? Tunnel work continues


The tunnel is beginning to feel like an onion, peeling the layers to reveal one more item that needs to be completed before the tunnel can be called complete. Mounted the bracket I made yesterday for the scat tube. Before securing it I took on drilling the holes for the three engine cable firewall pass-thrus. I cut the gap in…

Read More »

Do you enjoy watching paint dry?


Yep, wiring is a slow process. With no way to take exciting pictures, you will have to settle for a couple boring ones. Today was running the last of the wiring (I think) for the control sticks and for the light controller. Both will be located under the front seats. I did work on two of the VPX connectors but…

Read More »

Wing tip and tail lights, check


So I didn’t expect this step to take so long. Total of 8.25 hours for the three light, well technically five light boards. The tail frustrated me, there is an aluminum “C” bracket to attach the light. The problem was it was too big to fit the Van’s supplied tail cone. I sanded fiberglass, ground aluminum and after 90 minutes…

Read More »