Tag Archives : FlyLED

Success!


With four hours until the inspector arrived it was hustle time to knock off the last few items. First up was installing the lighting and Plexiglas in the right wing tip. After making a few passes on englarging the opening the landing and taxi lights slid right in and from there is was easy going. The wing root fairings were…

Read More »

Big final push


My work day started at 4:00am and I put in 16 hours getting my plane ready for tomorrows inspection. And yes, I am exhausted. But I should be ready to go after a few hours checking the final items off the list. Today I finally got around to the louvers on the bottom cowling. This was a time consuming process…

Read More »

Add certification to N241VP


No not the Airworthiness, but rather certification of the transponder and static systems. This was a much more involved process than I expected. All told it took three and a half hours. A good chunk of that was fixing leaks. At every threaded fitting there was a leak. I had used teflon tape but the system still leaked. Could have…

Read More »

Wiring part 2??? Tunnel work continues


The tunnel is beginning to feel like an onion, peeling the layers to reveal one more item that needs to be completed before the tunnel can be called complete. Mounted the bracket I made yesterday for the scat tube. Before securing it I took on drilling the holes for the three engine cable firewall pass-thrus. I cut the gap in…

Read More »

Let the Elevator riveting begin!


Lots of riveting today. My skills are slowly improving and there were only a couple rivets that I had to redo. The day started with priming the Elevator skins. And finished with work on wing tip light installation from FlyLEDs (needed a break from the riveting).

Read More »