Took some time but I got all the nut plates for the instruments installed and the instruments mounted. Also got the defrost fans installed, wired up, and tested. Then it was on to the baggage and rear seat pans. All the parts are now dimpled and deburred. Still nervous about a missed wire so I’ll hold off on riveting them in place for a bit. Also squeezed the trailing edges of the elevator trim tabs, so those are ready for pro-seal (foam blocks) and riveting.
No Comments