Monthly Archives : January 2021

Finally I have an engine!


Exciting part first, around 4:30 my engine arrived. And hour later the packaging foam was cut away and she was lifted up. Super exciting! Tomorrow hopefully she will be hanging off the front of my plane. This was another day of lost time… Annual physical/BasicMed exam, cancel oil cooler order, pay for new oil cooler, call FAA about registration (they…

Read More »

Oil Cooler and Baggage Door Installed


This week has been constantly interrupted by non-plane building crap. Bunch of real work and two drives to Denver – don’t ask. So progress has been slowed down. Ugh. One of the slowdowns was getting an oil cooler. I ordered one back in October and ship date after ship date slipped by. Airflow System has a supplier who has had…

Read More »

Tunnel done? I know you have heard this before


So I think the tunnel is done. Well actually I want to give it one last cleaning… So today was again shorter than normal due to a two hours IPC (Instrument Proficiency Check) in a RV-7A. Went well and technically I’m free to fly IFR. In reality I have lot of work to do learning glass panel flying. Today began…

Read More »

New year kick off


Late start today but still made some good progress – started with tightening the jam nuts and torque sealing the Elevator push/pull tubes. Then I fabricated an additional rudder cable guide and got it installed, followed by reorienting the rudder cable/pedal bolts to give more room from the rear seat scat tube and bent over the cotter pin in the…

Read More »