Tag Archives : Registration

Fun with brakes


I finished up the co-pilot door strut. Then made some adjustments to the door lock blocks, sprayed some silicon and bam the doors open, close, and lock perfectly. Then it was on to floxing in the carbon fiber door sill. Once that was clamped down I added a nice edge and filler to the rest of the door opening and…

Read More »

Such a relief, my registration was entered


Okay first off, I didn’t realize how long it takes for the FAA to process aircraft registrations and I really painted myself in a corner. Hell I even forgot to enter the engine serial number requiring a second notarized form to be sent UPS red. But today my registration came through. Huge relief to know that my inspection/first flight won’t…

Read More »

Finally I have an engine!


Exciting part first, around 4:30 my engine arrived. And hour later the packaging foam was cut away and she was lifted up. Super exciting! Tomorrow hopefully she will be hanging off the front of my plane. This was another day of lost time… Annual physical/BasicMed exam, cancel oil cooler order, pay for new oil cooler, call FAA about registration (they…

Read More »

Spar Tunnel Done?


For real, I think the spar tunnel is done until the wings go on… Started off adding connectors and drilling brackets made by fellow builder Leo for a set screw need to keep the Tosten stick grips from spinning. Then moved back into wiring mode to work on the connectors that stick grips plug into. That took awhile… Also soldered…

Read More »