Short hustle day


Started with crimping the BNC connectors for the ELT antenna and the COM2 antenna before moving back wheels. Oops, started the fuel tank pressure testing on the right side. Made Lee’s suggested plates on the wheel pants bracket and got them glued on. Tomorrow I will add some rivets and then do the final assembly of the mains. Then it…

Read More »

Let the electrical install commence


Today was a bit of jumping around. I got a number of the wires pulled through the airframe, mounted the magnometer bracket, got the static ports ProSealed. A big chunk of the day was spent on getting the wheels mounted. The Matco wheels/brakes was pretty straight forward to figure out the order of installation, wheels on the axles the next…

Read More »

Just a bit of progress and a lot of parts ordering


A big chunk of this week has been spent ordering electrical connectors and hardware. For me a painstaking process to determining what is needed, documenting it, and ordering it. It wasn’t only buying fun, I had four packages with items to return too. I’d much rather be building. I did manage to get a couple things accomplished today, the correct…

Read More »

Carbon Fiber day, so excited


Finished up cutting the holes for the defrost fans (2 of 2) which went quick and then it was on to the day’s major effort – cutting/sanding carbon fiber. First I took on the vents on the panel which was a warm up to the overhead console. The console had four vents which weren’t too bad other than a lot…

Read More »

So much for the planned wheel install today


I was so looking forward to getting the wheels on today. Landing gear installed – check. Tires, tubes, rims ready to go – check. Assembly, fuck me. Learned today that Matco wheels don’t use standard tubes. The hole for the valve is offet about an inch. Blerg, new tubes on order. On the positive side, ProSeal the bungs for the…

Read More »

Looking more like an airplane


Today a few more items were banged out. Got the first tail section top skin riveted on, drew up on CAD the revised battery box and COMM antenna doubler. Ordered those to be fabricated along with another Left Upper Panel piece, which needed to be updated since I switched from Lightspeed to dual P-Mags. Fingured out a bunch of connectors…

Read More »

Back to the ER tank grind


Man the number of operations for each bracket to mount the ER tanks in insane. The middle bracket is the most time consuming. On the left tank I thought it took four hours to fabricate. But today on the left I took nearly six hours (for one bracket). Sheesh. And I’m sure I was faster today… So all that is…

Read More »

Left ER Tank Bolted On


Damn, what a frustrating day, it wasn’t that anything went horribly wrong. Just one of those days. On the positive side, I did manage to get the left ER tank 100% bolted on, all that remains is running the fuel lines and tank vent. I keep going back to how much effort it was for the mid bracket (4 hours).…

Read More »

ER Mounting Day 2


Started the day installing the end ER tank brackets which went pretty smooth. Next was a bigger challenge getting the outboard tank mounts positioned. This seriously took way longer than I would expect but it has to be tilted so gravity moves the fuel to the inboard side of the tank, the wing tips have to fit, and there has…

Read More »

ER Tanks have fuel pumps!


Started with making a vacuum adapter for sucking the metal flakes when drilling the holes for the main fuel tank bung. Drilling went well but I did spend about 45 minutes deburring, vacuuming, and cleaning the tanks. I think and hope I got everything. Then it was on to installing the ER tank fuel pumps, once I deciphered how everything…

Read More »

Full steam ahead


With three of us working I bounced around a bit but my main focus was finishing the Vertical Stabilizer. I had some rivets on the rear spar before I could assemble and start the not so fun riveting which involved reaching way up inside the cavity for a number of hours. I also helped with the fuel valve/lines installation only…

Read More »