Stats for 2019 | |
Miles sailed: | 3,288 nm |
Longest passage: | 305 nm |
Days spent sailing: | 56 |
Nights at anchor: | 69 |
Nights at sea: | 7 |
Nights on the hard: | 0 |
Nights in marinas: | 18 |
Nights on a mooring ball: | 9 |
Nights living aboard: | 104 |
Number of crew (all, excluding Chris and Jean): | 17 |
Number of crew (family/friends): | 7 |
Number of anchorages: | 32 |
Number of marinas: | 4 |
Number of haul outs: | 1 |
How does this compare to 2018? Check it out
How does this compare to 2017? Check it out
How does this compare to 2016? Check it out
2019 Boat Projects |
Clean rigging |
Replace jib furling line |
Sand Port berth door top |
Replace flux gate (both functional) |
Replace Port and SB LCD display on ST70 instruments |
Replace SB raw water pump & clamp |
Spring clip on outboard fuel line |
New elasatic lines on screecher blocks |
Replace sink faucet filter |
Bottom paint |
Replace SB rudder bearings |
Rubber switch cover anchor AA560 |
316 stainless key circle rings for mainsail and lifelines |
Gori prop balancing |
Epoxy/toothpick SB head door hinge |
Glue SB head door hinge |
Glue rub rail on dinghy |
Paint frame of TV mount |
Replace anchor light fixture |
Bow sprit glue/bolt on |
Replace Port exhaust elbow |
Replace Heat exchanger |
Standing rigging, remove bolt and retension |
Replace bowsprit lines |
Change pesto valve on accumulator tank |
Pressurize accumulator tank |
Replace SB head base/macerator pump |
Replace cover from raw water filter for port head |
Velcro ceiling |
New window shade screens |
Wire loom over mast cables |
Snaps on cockpit cushions |
Snaps on instrument covers |
Tension dolphin striker |
Rig bowsprit |
No Comments